Electric power system network
is including province control
center, city control center, power
plan and transformer station.
In province control center, connect
Aliwei EID3000 series digital
gateway with PBX by E1 ports.
Set GK module in Aliwei IAD as
top GK. At the same time set standby
GK in another equipments as well
as network management and billing
system.
In city control center, connect
Aliwei EID3000 modulization analog
gateway or fixed analog gateway
EIA20X with PBX. Set GK in Aliwei
gateway or other equipments as
sub GK.
To power plan and transformer
station, set Aliwei IAD 4-32 ports
according the actual condition.
If PBX existed before, set EIA2004/O
and connect it with PBX. If the
new transformer station have not
connect PSTN, set Aliwei IAD and
configure it as PPPOE dial mode.
The calls between whole networking
will be free.
|